Resources · OEE value calculator
What could one point of OEE be worth?
Estimate the additional output value from the lines you already have, and see the annual subscription cost alongside it.
At 60% OEE, moving to 61% means about 1.7% more output over the same run time. On a line producing A$15M of product a year, that represents about A$250,000 in additional output value.
Understand the assumptions →Additional annual output value at +1 percentage point
A$250,000
- +1 percentage point
- A$250,000
- +2 percentage points
- A$500,000
- +3 percentage points
- A$750,000
- Annual Continual cost
- A$4,788
Illustrative output opportunity, not profit, guaranteed savings or a forecast of Continual's impact. Assumes equivalent lines, unchanged run time, product mix and unit value, and enough demand and downstream capacity to use the extra output. Subscription comparison uses Pro billed annually at A$399/line/month. Improvements above 100% OEE are excluded.
Next steps
Where is your line losing output?
Understand OEE, the small losses that add up and what an extra point means.
Production & operations
Run every shift to the standard and protect output.
Guide
The complete guide to autonomous maintenance
What AM is, the seven steps, why programs fade and how to measure them.
Start on one line today
Pick your most underperforming line. Set up its checks, run them for a month, and see what changes.
Risk-free results in 30 days
No credit card required. Unlimited operators and managers.
Pro plan from A$399 per line per month, billed annually.
See plans and pricing →